General Infrastructures of the Urbanization of Meia Praia, Lagos
The intervention following the Municipality Detailed Plan, included routes 1, 3, 5, 6, 7 and 14, totalling a length of 6300 m. The dual lane platform is 7,5m wide, with a 2,25m wide sidewalk at one side and a 2.25m wide bicycle path in the opposite side, separated by a green lane with 2.25 m with. These pathways are supplied with streetlights.
The pavements designed present a flexible structure on the traffic lanes, and concrete blocks for the sidewalks. Crossings have been provided for pedestrians and cyclists. Their location was defined at strategic locations at the beginning and at the end of the roads and next to the links with the adjacent routes, as well as along the roads, when the distances between crossings are large and allowing a continuity of the movement of pedestrians on sidewalks and cyclists on the bicycle path.
The intervention of CONSULMAR, in addition to the Roadway and Sewage and Storm water Networks Projects, also consisted in the Landscape Integration Project, in the Expropriation Project and in the Electrical and Telecommunication’s Networks Projects.
Location: Meia Praia, Lagos, Portugal
Employer: FUTURLAGOS, Empresa Municipal para o Desenvolvimento, E.M.